市政基础设施工程控制桩测量(复核)记录市政施-3第工程名称单位工程名称深圳如意路~东莞龙凤大道连接线道路工程南侧K0+465~K0+539.655段电缆沟沟槽开挖底设计坐标桩号XK0+465K0+470K0+480K0+490K0+500K0+510K0+520K0+530K0+539.655YXY△X0.0020.0030.005-0.002-0.0040.002-0.0010.0030.002△Y-0.001-0.0010.0020.0050.0010.003-0.003-0.0040.001设计61.44561.43161.34861.27561.20661.13961.0761.00160.935测试61.44861.43061.35061.28061.20461.14261.07160.99960.938差值0.003-0.0010.0020.005-0.0020.0030.001-0.0020.00337422.605129852.97937422.607129852.98037424.156129857.79437424.159129857.79537427.667129866.96537427.672129866.96337430.984129876.037430.982129876.04937434.029129885.08137434.025129885.08037436.7311294.05737436.7331294.037439.018129902.98737439.017129902.99037440.812129911.86537440.815129911.86937442.036129920.36637442.038129920.365承包单位分包单位实测坐标差值深圳市建艺市政工程有限公司/测量部位地面高程备注控制桩复核1页,共1页科维Q100300375仪器型号标定编号略图测量计算复核项目技术负责人测量日期2012/4/8